August 12 Workday

Celebrating installing the final tie along the Caboose Route

The Caboose route is now usable for ballasting operations. A switch stand was installed to access the new tracks, Bruce completed some basic leveling while the final missing ties were installed.

Enjoy the first ride along the new tracks with the two videos below.


Photos - click on images for text descriptions and large images


Video

First train along the Caboose Route and through the Redwood Canyon Tunnel