August 5 Workday

Bruce touches up the paint before we lay the decking

Bruce connecting the last panel between the Lumber Camp Loop and the Caboose Loop

With all track panels connected between the two loops it is time to start the long process of leveling the track. Once the track is level it will be possible to ballast using the heavy duty ballast hopper cars. The club engine may remain “stranded” on the new track for the duration of the ballasting operation.


Photos - click on images for text descriptions and large images