Bruce touches up the paint before we lay the decking

Ed tests a new track panel fixture that both gauges the rail and holds it in place

A clear day allowed for indoor and outdoor projects to proceed.

Ed is leading the analysis of the track panel rebuild procedure. New track fixtures were built by Tom and fine tuned by Carl.

Bill, Bruce, Matt, and Dee added ballast to the right of way at the site of the overlook ridge retaining wall.