February 4 Workday

Bruce touches up the paint before we lay the decking

Tom setting the foundation layer for the gritty gravel barn

There were a few downed branches and cleanup to take care of after a stormy week. The right-of-way is soupy with mud but there was no damage that needed to be repaired.

In the shop; Ed, Mike, Matt, and Bill continue to sort out track panel build issues. Carl made some new build fixture gauge blocks. All the existing gauge blocks were measured by Carl. At least 50% of them were not within spec and were disposed of.

Ken says that the TIG welder project has been put to bed by him and Kevin. Let’s see if this holds true for two weeks in a row.


Photos - click on images for text descriptions and large images