November 19 Workday

Bruce touches up the paint before we lay the decking

The Overlook Ridge retaining wall takes shape and looks like a wall

Dee, Matt, Brandon, Bruce, & Bill worked on the Overlook Ridge retaining wall. This cleverly designed wall will obviate the need to take out a few trees and do a bunch of dozer work. The structure is needed to facilitate a full 50’ radius gentle turn along the right of way.

Kevin and Bruce worked on surveying and a bit of grading for the right of way from the Lumber Camp Loop side. It was discovered that we need to replace the current crossover within the loop with a curved crossover. The current crossover will be left in place until a new one is fabricated.

Carl & Ken have brought the lathe refurb project to completion. Carl has donated a bunch of missing parts of pieces to the lathe to get it back into working order.