July 16 Workday

Bruce touches up the paint before we lay the decking

Bruce gave the Lumber Camp Bridge a second coat of paint

Bruce’s solo effort to give the bridge a second coat of paint was impressive to watch. Choosing gloss was a bit of an accident though we all like the way it shines.

The Lumber Camp Loop is now a complete loop. All the track is connected. Ballasting and leveling has commenced. You’ll be impressed with the new ruling grade of the right-of-way; 2.6%.

A proof of concept for the new signal system is being installed.