September 26 Workday

IMG_0472.jpeg

The left side of the center arch was installed today. Bruce delivered the freshly painted section on his trailer to Rabbit Flat. The section was dragged and pushed up to the summit. This was deemed to be the most difficult of the installs because this section needed to be lowered carefully into the gully next to the high bridge. Lots of ropes, D-rings and fancy knots were used to carefully place the bridge section.

Gil and Rene continued to refine our parts and pieces inventory.


Photos - click on images for text descriptions and large images


Video

Randy is pondering the lowering of the bridge into place