All about the Lumber Camp Loop. Laying track. Welding. Touch up paint. Heavy lifting. Bolting the center arch left-right sections together. It was a busy day.
The main task was to weld on two leg extensions to bring the latest bridge section to the correct height and apply a slight tilt (1/4” to 3/8” over 54”) to the bridge. We wanted to make this correction before fully welding the bridge in place forever.
Photos - click on images for text descriptions and large images
Video