November 02 Workday

Jerry using the lathe to thread a switch stand component

Work began on the yard at Rabbit Flat. There was a design meeting during lunch and Kevin started to install the pass-thru track

With the installation of two switch stands at the Redwood Canyon Tunnel Yard all track and yards are now available for use.

The Redwood Canyon Footbridge can now be used to move from the Redwood Canyon Tunnel Yard to the Caboose Yard! See video Below of Randy making this trek.


Photos - click on images for text descriptions and large images