October 27 Workday

Kevin starts to install new track in the Lakeside siding area

There was a flurry of activity in the Lakeside Siding area all day. The old bridge was removed and carted up to the shop. The track from the dock to Crana’s Corner was removed. Immediately Kevin started to install the new switches needed to convert the siding into the mainline for as long as needed.


Photos - click on images for text descriptions and large images


Videos    |    Photos


Videos - click on images to play video