Mike & Russ test the fixture for precision tie cutting
Kevin & Bruce repaired sections of track that were causing derails during the last two runs. Two switches needed to be repaired and lots of ballast was deployed. We hope that the dirt roads continue to dry so we can bring in heavy loads of ballast in the next few weeks.
Photos - click on images for text descriptions and large images