November 24 Workday

Bill and Mike discuss RAS (radial arm saw) setup to cut perfect ties

Lots got done on a Wednesday before the Thanksgiving holiday. It was a smaller than usual crew that kept themselves moving along with visual improvements.

Lance finished moving the Lumber Camp signal controller from the fire hose box to the underbelly of the Alpine Crossover bridge. The rabbit flat solar panel farm was doubled in size (using parts from the Alpine crossover area). Lance reports that signal light operation is thwarted at this time of the year by mud and moisture.


Photos - click on images for text descriptions and large images